Modular water reuse for factories

Your wastewater, clean enough to use again.

Tarn is a reuse plant on one skid. It sits beside your line and returns most of your process water to it. Four stages, no new building.

Book a site survey
Scroll to treat it
Stage 01 of 04

Screen

Rotating drum screens take out fibres, grit and anything over half a millimetre before it reaches the tanks.

Mesh
0.5 mm wedge wire
Removes
Coarse solids, fibres
Stage 02 of 04

Settle

A lamella clarifier lets the heavy fraction drop out. Sludge goes to a press. The water moves on, still grey.

Plates
55° lamella pack
Removes
Settleable solids
Stage 03 of 04

Filter

Ultrafiltration membranes with 0.02 µm pores hold back what settling missed: fine solids, oils, most bacteria.

Pore size
0.02 µm hollow fibre
Removes
Fines, oils, bacteria
Stage 04 of 04

Polish

Reverse osmosis and UV bring it to process grade: water your boilers, rinse lines and cooling towers will take.

Outlet
< 1 NTU, logged every 60 s
Returns
To the line
Raw effluent

    The plant · Reuse skid R1

    Four stages on one skid, beside your line.

    Under the water you saw each stage in section. Out of the water it is one machine on a 12.2 m frame: it takes the water your line sends to drain, treats it in four stages and returns it to the line, with a reading at the outlet every 60 seconds.

    FROM THE LINE TO THE LINE 2 750 12 200 · ONE SKID, SIZED FOR A LOADING BAY REUSE SKID R1 · ELEVATION · 1:50 ISSUED FOR INFORMATION SKIP 01 · SCREEN 02 · SETTLE 03 · FILTER PLC 04 · POLISH
    REUSE SKID R1 · ELEVATION · 1:50 IN 2 ROWS, JOINED AT MATCH LINES · ISSUED FOR INFORMATION FROM THE LINE TO THE LINE 2 750 SKIP 01 · SCREEN 02 · SETTLE MATCH B FROM THE LINE TO THE LINE 2 750 03 · FILTER PLC 04 · POLISH MATCH B 12 200 OVERALL · ONE SKID, SIZED FOR A LOADING BAY
    REUSE SKID R1 · ELEVATION · 1:50 IN 4 ROWS, JOINED AT MATCH LINES · ISSUED FOR INFORMATION FROM THE LINE TO THE LINE 2 750 SKIP 01 · SCREEN MATCH A FROM THE LINE TO THE LINE 2 750 02 · SETTLE MATCH A MATCH B FROM THE LINE TO THE LINE 2 750 03 · FILTER MATCH B MATCH C FROM THE LINE TO THE LINE 2 750 PLC 04 · POLISH MATCH C 12 200 OVERALL · ONE SKID, SIZED FOR A LOADING BAY
    Elevation · Four stages on one frame
    Footprint
    12.2 × 2.4m
    Daily flow
    50 to 400m³ a day
    Returned to the line
    Up to 80% by volume
    Outlet
    Under 1NTU
    Power
    1.2kWh per m³
    Tie-ins
    2one in, one out
    1. 01 · Day 1

      Site survey

      An engineer walks your line, samples the water and reads a week of your meters.

    2. 02 · Weeks 2 to 5

      Pilot

      A pilot skid runs on your own water for four weeks. You see the figures before you commit.

    3. 03 · Two days

      Connect

      The full skid arrives on a flatbed and ties in at two points, one in and one out.

    4. 04 · Every 60 s

      Logged

      Turbidity, flow and pressure are logged at the outlet, in readings your auditors can check.

    See the plant in detail

    Pilot figures · First site

    What comes back to the line.

    80%

    of process water returned, by volume

    6weeks

    from the site survey to the first litre back

    31%

    off the site's mains water bill in the first quarter

    0.10NTU

    at the outlet, logged every 60 seconds

    Read the pilots

    Who it is for

    Lines that run on water.

    • Food and drink

      Clean-in-place rinses and bottle wash, treated and sent back to the wash.

      Reuses · CIP and rinse water
    • Textiles

      Rinse water from the dye house, clear enough to rinse the next batch.

      Reuses · Rinse after dyeing
    • Metal finishing

      Plating rinse lines, with the metals held back for recovery.

      Reuses · Plating rinse
    • Cooling water

      Tower blowdown, treated and returned as make-up water.

      Reuses · Blowdown

    Company

    Tarn is an engineering company in Sheffield. We build one machine: a reuse plant that fits beside a production line. A factory should not have to buy the same water twice.

    About Tarn

    Book a site survey

    Send us a week of meter readings.

    We will tell you how much of your water Tarn would return, and what it would not take.

    Book a site survey

    One day on site · The first survey is free